LaM Museum of Modern Art
The ends of the extension to the LaM (Lille Métropole, Gallery of Modern, Contemporary and Outsider Art) are faced with 260 m2 of openwork panels of ultra high performance fibre reinforced concrete (UHPFRC). The 38 perforated panels are all different. Their patterns maintain continuity with the designs stamped on the adjacent concrete walls.
Project Information:
- Material used:
- Architect:
- Customer:
- Industry:
- City:
- Country: